Foundation Drilling Tools are needed to drill a large hole. For drilling, self-propelled equipment equipped with rotary machines is used, and the excavation tool is selected according to the type of soil to be excavated. In this way, it is possible to construct the piles as planned in view of the lithological and hydrogeological conditions of the site, as well as the size (length and diameter) of the piles to be constructed. The first method used in the presence of gravel soils consists of driving steel pipes by rotating or percussion. In some cases, vibration is used with special tools called vibrators. A type of toothed basket, the core barrel, is used to cross hard rocky terrain.
The drilling method is an element of the construction process. The only condition for the structure to be strong is that the foundation is very solid. Even the largest skyscrapers can be built with this method. The use of pile structures in the foundation allows it to with stand more serious loads, save on construction, shorten the duration of construction work.
The requested Foundation Drilling Tools are used to drill holes up to 7 m deep in the construction of summer houses, minimal houses and small architectural forms. These implements are equipped with a motor (electric, hydraulic, petrol) that drives a single/twin screw auger. The advantages of such a device include compactness, mobility, ease of transportation and management, the ability to use indoors and in high-rise buildings. An extension rod can be added to the auger for deep drilling.
The manual pile drilling rig works with a variety of soil types using removable nozzles:
standard augers are used for plowing soft, uncomplicated soil (clay or sandy);
rocky - equipped with hard alloy teeth crushing stone;
for frozen soil - carbide blades are used;
for ice - they have blades with special sharpening and angle of attack.
The method of creating a well using auger drilling is one of the most convenient, since the drilling sequence raises the rock with the help of an auger surface (flange). Mechanization of several stages allows you to reduce the cost of time and money. Employees do not need to clean the auger separately, everything is done automatically.
However, the tool used in the process has its own usage limit, it is subject to wear. From time to time, even the strongest parts need to be replaced to keep up with the fast pace of production. Hydrogeological, construction and engineering, technical, mineral exploration, etc. New drilling equipment, tools and components may be needed in various industries while solving various problems such as It's a great way to create holes for piles and strengthen the foundation.
For the construction of the foundation from bored piles, a pile-driving drilling rig is used, made in the form of attachments of replaceable equipment mounted on the chassis of a tracked or wheeled tractor, truck, excavator. Powerful and high-performance, maneuverable, highly cross-country, Foundation Drilling Tools enable a team of workers to quickly reach the drill site and drill in places with limited maneuverability, even in challenging road and/or weather conditions. If the relief of the site does not allow you to approach the drilling site, then a drilling rig is used to drill piles based on a manipulator. Its telescopic boom makes it possible to work at a certain distance from the machine.
Drilling wells for piles are made to a depth of 4.5 meters. The diameter of the holes is from 250 to 600 mm. They are placed strictly vertically in accordance with the project, which ensures the correct installation of the pile foundation. Depending on the type of soil, the location of the object, the required depth and other conditions, two types of tools are used:
Manual gas drill (motor drill). With a small amount of work, the involvement of special equipment is impractical. Drilling for foundation piles is carried out using a special tool: a power drill allows you to quickly prepare holes for installing a foundation for a country house or other small building.
According to the project, a shelf drilling rig is used if the piles must be very deep or if the geology of the area indicates the presence of rocks that a power drill and mounted pit drills cannot cope with.
A telescopic boom drill can be used on a site of any size. Thanks to the boom's wide reach, work can be done even in hard-to-reach places. Foundation Drilling Tools prices are calculated depending on the tool chosen, the nature of the soil, the depth of the holes and some other factors.